Show simple item record

dc.contributor.authorBulut, O.
dc.contributor.authorTasgetiren, M.F.
dc.contributor.authorFadiloglu, M.M.
dc.date.accessioned2021-01-25T20:51:12Z
dc.date.available2021-01-25T20:51:12Z
dc.date.issued2011
dc.identifier10.1007/978-3-642-25944-9_8
dc.identifier.issn03029743
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84855665274&doi=10.1007%2f978-3-642-25944-9_8&partnerID=40&md5=7c06990c25fe819c5843d21acec88a2a
dc.identifier.urihttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10602
dc.description.abstractIn this study, we propose a genetic algorithm (GA) for the economic lot scheduling problem (ELSP) under extended basic period (EBP) approach and power-of-two (PoT) policy. The proposed GA employs a multi-chromosome solution representation to encode PoT mu
dc.language.isoEnglish
dc.publisherLecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
dc.titleA genetic algorithm for the economic lot scheduling problem under extended basic period approach and power-of-two policy
dc.typeConference Paper
dc.relation.firstpage57
dc.relation.lastpage65
dc.relation.volume6839 LNAI
dc.description.affiliationsIndustrial Engineering Department, Yasar University, Izmir, Turkey; Industrial and Systems Engineering Department, Izmir Economy University, Izmir, Turkey


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record