Show simple item record

dc.contributor.authorKalaycilar, E.G.
dc.contributor.authorAzizoglu, M.
dc.contributor.authorYeralan, S.
dc.date.accessioned2021-01-25T20:49:20Z
dc.date.available2021-01-25T20:49:20Z
dc.date.issued2016
dc.identifier10.1016/j.ejor.2015.09.004
dc.identifier.issn03772217
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84952984791&doi=10.1016%2fj.ejor.2015.09.004&partnerID=40&md5=f581447d7c2745b83b97e6ea23794fab
dc.identifier.urihttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10212
dc.description.abstractIn this study, a Disassembly Line Balancing Problem with a fixed number of workstations is considered. The product to be disassembled comprises various components, which are referred to as its parts. There is a specified finite supply of the product to be
dc.language.isoEnglish
dc.publisherEuropean Journal of Operational Research
dc.titleA disassembly line balancing problem with fixed number of workstations
dc.typeConference Paper
dc.relation.firstpage592
dc.relation.lastpage604
dc.relation.volume249
dc.relation.issue2
dc.description.affiliationsASELSAN, Naval Systems Program Dirct., Ankara, 06172, Turkey; Department of Industrial Engineering, Middle East Technical University, Ankara, 06800, Turkey; Department of Industrial Engineering, Yaşar University, Izmir, Turkey


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record