A Bus Crew Scheduling Problem with Eligibility Constraints and Time Limitations
Tarih
2017Yazar
Oztop, H.
Eliiyi, U.
Tursel Eliiyi, D.
Kandiller, L.
Üst veri
Tüm öğe kaydını gösterÖzet
In this study, we consider a real life crew scheduling problem (CSP) of a public bus transportation authority, where the objective is to determine the optimal number of different types of crew members with a minimum cost that cover a given set of tasks re
Bağlantı
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85019490422&doi=10.1016%2fj.trpro.2017.03.029&partnerID=40&md5=7559f0b9fbc09072d184603d5b959a6fhttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10129
Koleksiyonlar

DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..