dc.contributor.author | Huang, J.P. | |
dc.contributor.author | Pan, Q.K. | |
dc.contributor.author | Tasgetiren, M.F. | |
dc.contributor.author | Huang, Y.Y. | |
dc.contributor.editor | | |
dc.date.accessioned | 2021-01-25T20:47:55Z | |
dc.date.available | 2021-01-25T20:47:55Z | |
dc.date.issued | 2020 | |
dc.identifier | 10.23919/CCC50068.2020.9188727 | |
dc.identifier.issn | 19341768 | |
dc.identifier.uri | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85091401885&doi=10.23919%2fCCC50068.2020.9188727&partnerID=40&md5=9c82d449bf0f55a0bd761b1d65abcb06 | |
dc.identifier.uri | https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/9617 | |
dc.description.abstract | In this paper, we present a new heuristic to divide a batch of printed circuit boards (PCBs) into subgroups to save the setup time for loading and unloading components from the assembly machine. In the heuristic, we propose several concepts about similari | |
dc.language.iso | English | |
dc.publisher | Chinese Control Conference, CCC | |
dc.title | A New Heuristic for PCBs Grouping Problem with Setup Times | |
dc.type | Conference Paper | |
dc.relation.firstpage | 1495 | |
dc.relation.lastpage | 1500 | |
dc.relation.volume | 2020-July | |
dc.description.affiliations | Shanghai University, School of Mechatronic Engineering and Automation, Shanghai, 200072, China; Yasar University, International Logistics Management Department, Izmir, Turkey | |