An energy-efficient permutation flowshop scheduling problem
Date
2020Author
Oztop, H.
Tasgetiren, M.F.
Tursel Eliiyi, D.
Pan, Q.K.
Kandiller, L.
Metadata
Show full item recordAbstract
The permutation flowshop scheduling problem (PFSP) has been extensively explored in scheduling literature because it has many real-world industrial implementations. In some studies, multiple objectives related to production efficiency have been considered
URI
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85079326964&doi=10.1016%2fj.eswa.2020.113279&partnerID=40&md5=0bc2b3f5a222bfaa16c74fb6c3571edfhttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/9614
Collections
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..