A Variable Block Insertion Heuristic for Single Machine with Release Dates and Sequence Dependent Setup Times for Makespan Minimization
Abstract
This paper is concerned with solving the single machine scheduling problem with release dates and sequence-dependent setup times in order to minimize the makespan. For this purpose, a variable block insertion heuristic (VBIH) algorithm is applied to the p
Collections
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..