Show simple item record

dc.contributor.authorYuksel, D.
dc.contributor.authorTasgetiren, M.F.
dc.contributor.authorKandiller, L.
dc.contributor.authorGao, L.
dc.date.accessioned2021-01-25T19:32:35Z
dc.date.available2021-01-25T19:32:35Z
dc.date.issued2020
dc.identifier10.1016/j.cie.2020.106431
dc.identifier.issn0360-8352
dc.identifier.urihttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/7269
dc.description.abstractIn manufacturing scheduling, sustainability concerns that raise from the service-oriented performance criteria have seldom been studied in the literature. This study aims to fill this gap in the literature by integrating the different energy consumption l
dc.language.isoEnglish
dc.publisherPERGAMON-ELSEVIER SCIENCE LTD
dc.titleAn energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption
dc.typeArticle
dc.relation.volume145
dc.description.woscategoryComputer Science, Interdisciplinary Applications; Engineering, Industrial
dc.description.wosresearchareaComputer Science; Engineering
dc.identifier.wosidWOS:000542180000001


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record