An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption
Abstract
In manufacturing scheduling, sustainability concerns that raise from the service-oriented performance criteria have seldom been studied in the literature. This study aims to fill this gap in the literature by integrating the different energy consumption l
Collections
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..