dc.contributor.author | Tasgetiren, M.F. | |
dc.contributor.author | Bulut, O. | |
dc.contributor.author | Fadiloglu, M.M. | |
dc.date.accessioned | 2021-01-25T20:51:18Z | |
dc.date.available | 2021-01-25T20:51:18Z | |
dc.date.issued | 2011 | |
dc.identifier | 10.1109/SDE.2011.5952072 | |
dc.identifier.uri | https://www.scopus.com/inward/record.uri?eid=2-s2.0-79961143411&doi=10.1109%2fSDE.2011.5952072&partnerID=40&md5=22a105b45da19787fc4ff5943b6a9f9b | |
dc.identifier.uri | https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10620 | |
dc.description.abstract | In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machin | |
dc.language.iso | English | |
dc.publisher | IEEE SSCI 2011 - Symposium Series on Computational Intelligence - SDE 2011: 2011 IEEE Symposium on Differential Evolution | |
dc.title | A differential evolution algorithm for the economic lot scheduling problem | |
dc.type | Conference Paper | |
dc.relation.firstpage | 164 | |
dc.relation.lastpage | 169 | |
dc.description.affiliations | Industrial Engineering Department, Yasar University, Izmir, Turkey; Industrial and Systems Engineering, Izmir University of Economics, Izmir, Turkey | |