A differential evolution algorithm for the economic lot scheduling problem
Abstract
In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machin
URI
https://www.scopus.com/inward/record.uri?eid=2-s2.0-79961143411&doi=10.1109%2fSDE.2011.5952072&partnerID=40&md5=22a105b45da19787fc4ff5943b6a9f9bhttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10620
Collections
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..