Lagrangian heuristic for scheduling a steelmaking-continuous casting process
Özet
One of the biggest bottlenecks in iron and steel production is the steelmaking-continuous casting (SCC) process, which consists of steel-making, refining and continuous casting. The production scheduling of SCC is a complex hybrid flowshop (HFS) schedulin