• Türkçe
    • English
  • English 
    • Türkçe
    • English
  • Login
View Item 
  •   DSpace Home
  • ARAŞTIRMA ÇIKTILARI (WoS-Scopus-TR-Dizin-PubMed)
  • Scopus İndeksli Yayınlar Koleksiyonu
  • View Item
  •   DSpace Home
  • ARAŞTIRMA ÇIKTILARI (WoS-Scopus-TR-Dizin-PubMed)
  • Scopus İndeksli Yayınlar Koleksiyonu
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

An iterated greedy algorithm for the hybrid flowshop problem with makespan criterion

Thumbnail
Date
2014
Author
Kizilay, D.
Tasgetiren, M.F.
Pan, Q.K.
Wang, L.
Metadata
Show full item record
Abstract
The main contribution of this paper is to present some novel constructive heuristics for the the hybrid flowshop scheduling (HFS) problem with the objective of minimizing the makespan for the first time in the literature. We developed the constructive heu
URI
https://www.scopus.com/inward/record.uri?eid=2-s2.0-84922573105&doi=10.1109%2fCIPLS.2014.7007156&partnerID=40&md5=0f07fa585c2efe2b8ed0b48b64549d7e
https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10406
Collections
  • Scopus İndeksli Yayınlar Koleksiyonu





Creative Commons License
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV
 

 




| Politika | Rehber | İletişim |

sherpa/romeo

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsBy TypeBy PublisherBy LanguageThis CollectionBy Issue DateAuthorsTitlesSubjectsBy TypeBy PublisherBy Language

My Account

LoginRegister

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV