Energy-efficient single machine total weighted tardiness problem with sequence-dependent setup times
Date
2018Author
Tasgetiren, M.F.
Oztop, H.F.
Eliiyi, U.
Tursel Eliiyi, D.
Pan, Q.K.
Metadata
Show full item recordAbstract
Most of the problems defined in the scheduling literature do not yet take into account the energy consumption of manufacturing processes, as in most of the variants with tardiness objectives. This study handles scheduling of jobs with due dates and sequen
URI
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85051855939&doi=10.1007%2f978-3-319-95930-6_76&partnerID=40&md5=40a4a3ba3078f4e88936f92b63b940d5https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10019
Collections
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..