• Türkçe
    • English
  • English 
    • Türkçe
    • English
  • Login
Search 
  •   DSpace Home
  • ARAŞTIRMA ÇIKTILARI (WoS-Scopus-TR-Dizin-PubMed)
  • Search
  •   DSpace Home
  • ARAŞTIRMA ÇIKTILARI (WoS-Scopus-TR-Dizin-PubMed)
  • Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Search

Show Advanced FiltersHide Advanced Filters

Filters

Use filters to refine the search results.

Now showing items 151-160 of 162

  • Sort Options:
  • Relevance
  • Title Asc
  • Title Desc
  • Issue Date Asc
  • Issue Date Desc
  • Results Per Page:
  • 5
  • 10
  • 20
  • 40
  • 60
  • 80
  • 100
Thumbnail

A discrete harmony search algorithm for the economic lot scheduling problem with power of two policy 

Tasgetiren, M.F.; Bulut, O.; Fadiloglu, M.M. (2012 IEEE Congress on Evolutionary Computation, CEC 2012, 2012)
In this paper, we present a problem specific discrete harmony search (DHS) algorithms to solve the economic lot scheduling problem (ELSP) under the extended basic period (EBP) approach and power-of-two (PoT) policy. In ...
Thumbnail

Energy-efficient single machine total weighted tardiness problem with sequence-dependent setup times 

Tasgetiren, M.F.; Oztop, H.F.; Eliiyi, U.; Tursel Eliiyi, D.; Pan, Q.K. (Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 2018)
Most of the problems defined in the scheduling literature do not yet take into account the energy consumption of manufacturing processes, as in most of the variants with tardiness objectives. This study handles scheduling ...
Thumbnail

Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion 

Gao, K.Z.; Suganthan, P.N.; Tasgetiren, M.F.; Pan, Q.K.; Sun, Q.Q. (Computers and Industrial Engineering, 2015)
This study investigates the flexible job shop scheduling problem (FJSP) with new job insertion. FJSP with new job insertion includes two phases: initializing schedules and rescheduling after each new job insertion. ...
Thumbnail

A multi-objective harmony search algorithm for sustainable design of floating settlements 

Cubukcuoglu, C.; Chatzikonstantinou, I.; Tasgetiren, M.F.; Sariyildiz, I.S.; Pan, Q.K. (Algorithms, 2016)
This paper is concerned with the application of computational intelligence techniques to the conceptual design and development of a large-scale floating settlement. The settlement in question is a design for the area of ...
Thumbnail

A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem 

Wang, L.; Pan, Q.K.; Tasgetiren, M.F. (Computers and Industrial Engineering, 2011)
This paper proposes a hybrid modified global-best harmony search (hmgHS) algorithm for solving the blocking permutation flow shop scheduling problem with the makespan criterion. First of all, the largest position value ...
Thumbnail

A Multi-Objective Self-Adaptive Differential Evolution Algorithm for Conceptual High-Rise Building Design 

Ekici, B.; Chatzikonstantinou, I.; Sariyildiz, I.S.; Tasgetiren, M.F.; Pan, Q.K. (IEEE, 2016)
This paper presents a multi-objective self-adaptive differential evolution algorithm to solve the form-finding problem of high-rise building design in the conceptual phase. The aim of the research is to reach suitable ...
Thumbnail

Multi-Objective Optimization Through Differential Evolution for Restaurant Design 

Cubukcuoglu, C.; Chatzikonstantinou, I.; Ekici, B.; Sariyildiz, I.S.; Tasgetiren, M.F. (IEEE, 2016)
This paper presents the results obtained by NSGA-II and jDEMO on a restaurant design optimization in the conceptual phase. A multi-objective problem is formulated by considering the minimization of investment and the ...
Thumbnail

A General Variable Neighborhood Search for the NoIdle Flowshop Scheduling Problem with Makespan Criterion 

Shen, L.S.; Tasgetiren, M.F.; Oztop, H.; Kandiller, L.; Gao, L. (2019 IEEE Symposium Series on Computational Intelligence, SSCI 2019, 2019)
This paper proposes a novel general variable neighborhood search (GVNS) algorithm to solve the no-idle flowshop scheduling problem with the makespan criterion. The initial solution of the GVNS is generated using the FRB5 ...
Thumbnail

A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities 

Li, J.; Pan, Q.K.; Tasgetiren, M.F. (Applied Mathematical Modelling, 2014)
This paper presents a novel discrete artificial bee colony (DABC) algorithm for solving the multi-objective flexible job shop scheduling problem with maintenance activities. Performance criteria considered are the maximum ...
Thumbnail

Hospital layout design renovation as a Quadratic Assignment Problem with geodesic distances 

Cubukcuoglu, C.; Nourian, P.; Tasgetiren, M.F.; Sariyildiz, I.S. (Elsevier, 2021)
Hospital facilities are known as functionally complex buildings. There are usually configurational problems that lead to inefficient transportation processes for patients, medical staff, and/or logistics of materials. The ...
  • 1
  • . . .
  • 13
  • 14
  • 15
  • 16
  • 17





Creative Commons License
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV
 

 




| Politika | Rehber | İletişim |

sherpa/romeo

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsBy TypeBy PublisherBy LanguageThis CommunityBy Issue DateAuthorsTitlesSubjectsBy TypeBy PublisherBy Language

My Account

LoginRegister

Discover

Author
Tasgetiren, M.F. (162)
Pan, Q.K. (103)Suganthan, P.N. (52)Kizilay, D. (21)Sariyildiz, I.S. (19)Bulut, O. (16)Karabulut, K. (13)Gao, L. (12)Oztop, H. (12)Cubukcuoglu, C. (11)... View MoreSubjectArchitectural space planning (2)Building simulation (2)Computational design (2)Distributed permutation flowshop scheduling (2)Energy efficient (2)High-rise building (2)Hospital layout (2)Machine learning (2)Optimization (2)Performance-based design (2)... View MoreDate Issued2020 - 2021 (25)2010 - 2019 (137)Has File(s)No (155)Yes (7)

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV