Search
Now showing items 1-10 of 155
Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times
(SPRINGER INTERNATIONAL PUBLISHING AG, 2018)
Most of the problems defined in the scheduling literature do not yet take into account the energy consumption of manufacturing processes, as in most of the variants with tardiness objectives. This study handles scheduling ...
Green Permutation Flowshop Scheduling: A Trade- off- Between Energy Consumption and Total Flow Time
(SPRINGER INTERNATIONAL PUBLISHING AG, 2018)
Permutation flow shop scheduling problem (PFSP) is a well-known problem in the scheduling literature. Even though many multi-objective PFSPs are presented in the literature with the objectives related to production efficiency ...
An energy-efficient permutation flowshop scheduling problem
(PERGAMON-ELSEVIER SCIENCE LTD, 2020)
The permutation flowshop scheduling problem (PFSP) has been extensively explored in scheduling literature because it has many real-world industrial implementations. In some studies, multiple objectives related to production ...
An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption
(PERGAMON-ELSEVIER SCIENCE LTD, 2020)
In manufacturing scheduling, sustainability concerns that raise from the service-oriented performance criteria have seldom been studied in the literature. This study aims to fill this gap in the literature by integrating ...
Ensemble of metaheuristics for energy-efficient hybrid flowshops: Makespan versus total energy consumption
(ELSEVIER, 2020)
Due to its practical relevance, the hybrid flowshop scheduling problem (HFSP) has been widely studied in the literature with the objectives related to production efficiency. However, studies regarding energy consumption ...
An Effective Discrete Artificial Bee Colony Algorithm for Scheduling an Automatic-Guided-Vehicle in a Linear Manufacturing Workshop
(IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC, 2020)
This paper deals with a new automatic guided vehicle (AGV) scheduling problem from the material handling process in a linear manufacturing workshop. The problem is to determine a sequence of Cells for AGV to travel to ...
Future Trends and Current State of Smart City Concepts: A Survey
(IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC, 2020)
Intelligent systems are wanting for cities to cope with limited spaces and resources across the world. As a result, smart cities emerged mainly as a result of highly innovative ICT industries and markets, and additionally, ...
An evolution strategy approach to the team orienteering problem with time windows
(PERGAMON-ELSEVIER SCIENCE LTD, 2020)
The team orienteering problem with time windows (TOPTW) is a highly constrained NP-hard problem having many practical applications in vehicle routing and production scheduling. The TOPTW is an extended variant of the ...
Metaheuristic algorithms for the hybrid flowshop scheduling problem
(PERGAMON-ELSEVIER SCIENCE LTD, 2019)
The hybrid flowshop scheduling problem (HFSP) has been widely studied in the literature, as it has many real-life applications in industry. Even though many solution approaches have been presented for the HFSP with makespan ...
OPTIMUS: Self-Adaptive Differential Evolution with Ensemble of Mutation Strategies for Grasshopper Algorithmic Modeling
(MDPI, 2019)
Most of the architectural design problems are basically real-parameter optimization problems. So, any type of evolutionary and swarm algorithms can be used in this field. However, there is a little attention on using ...