• Türkçe
    • English
  • English 
    • Türkçe
    • English
  • Login
Search 
  •   DSpace Home
  • Search
  •   DSpace Home
  • Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Search

Show Advanced FiltersHide Advanced Filters

Filters

Use filters to refine the search results.

Now showing items 1-4 of 4

  • Sort Options:
  • Relevance
  • Title Asc
  • Title Desc
  • Issue Date Asc
  • Issue Date Desc
  • Results Per Page:
  • 5
  • 10
  • 20
  • 40
  • 60
  • 80
  • 100
Thumbnail

Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion 

Gao, K.Z.; Suganthan, P.N.; Tasgetiren, M.F.; Pan, Q.K.; Sun, Q.Q. (Computers and Industrial Engineering, 2015)
This study investigates the flexible job shop scheduling problem (FJSP) with new job insertion. FJSP with new job insertion includes two phases: initializing schedules and rescheduling after each new job insertion. ...
Thumbnail

An effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time 

Gao, K.Z.; Suganthan, P.N.; Pan, Q.K.; Tasgetiren, M.F. (International Journal of Production Research, 2015)
This study addresses flexible job shop scheduling problem (FJSP) with fuzzy processing time. The fuzzy or uncertainty of processing time is one of seven characteristics in remanufacturing. A discrete harmony search (DHS) ...
Thumbnail

Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion 

Gao, K.Z.; Suganthan, P.N.; Tasgetiren, M.F.; Pan, Q.K.; Sun, Q.Q. (PERGAMON-ELSEVIER SCIENCE LTD, 2015)
This study investigates the flexible job shop scheduling problem (FJSP) with new job insertion. FJSP with new job insertion includes two phases: initializing schedules and rescheduling after each new job insertion. ...
Thumbnail

An effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time 

Gao, K.Z.; Suganthan, P.N.; Pan, Q.K.; Tasgetiren, M.F. (TAYLOR & FRANCIS LTD, 2015)
This study addresses flexible job shop scheduling problem (FJSP) with fuzzy processing time. The fuzzy or uncertainty of processing time is one of seven characteristics in remanufacturing. A discrete harmony search (DHS) ...





Creative Commons License
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV
 

 




| Politika | Rehber | İletişim |

sherpa/romeo

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsBy TypeBy PublisherBy Language

My Account

LoginRegister

Discover

AuthorGao, K.Z. (4)
Pan, Q.K. (4)
Suganthan, P.N. (4)
Tasgetiren, M.F. (4)
Sun, Q.Q. (2)Date Issued
2015 (4)
Has File(s)No (4)

DSpace software copyright © 2002-2016  DuraSpace
Contact Us | Send Feedback
Theme by 
Atmire NV