Basit öğe kaydını göster

dc.contributor.authorEliiyi, U.
dc.contributor.authorTasgetiren, M.F.
dc.contributor.authorKizilay, D.
dc.contributor.authorOztop, H.
dc.contributor.authorPan, Q.K.
dc.date.accessioned2021-01-25T20:48:32Z
dc.date.available2021-01-25T20:48:32Z
dc.date.issued2018
dc.identifier10.1145/3205651.3205714
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85051544530&doi=10.1145%2f3205651.3205714&partnerID=40&md5=9c8f0ce2008d1568e7b344b61c6c57d4
dc.identifier.urihttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/9955
dc.description.abstractThis study considers single machine scheduling with the machine operating at varying speed levels for different jobs with release dates and sequence-dependent setup times, in order to examine the trade-off between makespan and total energy consumption. A
dc.language.isoEnglish
dc.publisherGECCO 2018 Companion - Proceedings of the 2018 Genetic and Evolutionary Computation Conference Companion
dc.titleAn energy-efficient single machine scheduling with release dates and sequence-dependent setup times
dc.typeConference Paper
dc.relation.firstpage145
dc.relation.lastpage146
dc.description.affiliationsDepartment of Computer Science, Dokuz Eylül University, İzmir, Turkey; Department of International Logistics Management, Yasar University, İzmir, Turkey; Department of Industrial Engineering, Yasar University, İzmir, Turkey; State Key Laboratory, Huazhong


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster