dc.contributor.author | Eliiyi, U. | |
dc.contributor.author | Tasgetiren, M.F. | |
dc.contributor.author | Kizilay, D. | |
dc.contributor.author | Oztop, H. | |
dc.contributor.author | Pan, Q.K. | |
dc.date.accessioned | 2021-01-25T20:48:32Z | |
dc.date.available | 2021-01-25T20:48:32Z | |
dc.date.issued | 2018 | |
dc.identifier | 10.1145/3205651.3205714 | |
dc.identifier.uri | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85051544530&doi=10.1145%2f3205651.3205714&partnerID=40&md5=9c8f0ce2008d1568e7b344b61c6c57d4 | |
dc.identifier.uri | https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/9955 | |
dc.description.abstract | This study considers single machine scheduling with the machine operating at varying speed levels for different jobs with release dates and sequence-dependent setup times, in order to examine the trade-off between makespan and total energy consumption. A | |
dc.language.iso | English | |
dc.publisher | GECCO 2018 Companion - Proceedings of the 2018 Genetic and Evolutionary Computation Conference Companion | |
dc.title | An energy-efficient single machine scheduling with release dates and sequence-dependent setup times | |
dc.type | Conference Paper | |
dc.relation.firstpage | 145 | |
dc.relation.lastpage | 146 | |
dc.description.affiliations | Department of Computer Science, Dokuz Eylül University, İzmir, Turkey; Department of International Logistics Management, Yasar University, İzmir, Turkey; Department of Industrial Engineering, Yasar University, İzmir, Turkey; State Key Laboratory, Huazhong | |