dc.contributor.author | Tasgetiren, M.F. | |
dc.contributor.author | Bulut, O. | |
dc.contributor.author | Fadiloglu, M.M. | |
dc.date.accessioned | 2021-01-25T19:36:06Z | |
dc.date.available | 2021-01-25T19:36:06Z | |
dc.date.issued | 2011 | |
dc.identifier.issn | 2330-2372 | |
dc.identifier.uri | https://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/8266 | |
dc.description.abstract | In this study we provide a Differential Evolution (DE) based heuristic to solve the Economic Lot Scheduling Problem (ELSP) under basic period approach. The problem is to find the best cyclic production schedule of n items to be produced on a single machin | |
dc.language.iso | English | |
dc.publisher | IEEE | |
dc.title | A Differential Evolution Algorithm for the Economic Lot Scheduling Problem | |
dc.type | Proceedings Paper | |
dc.relation.firstpage | 157 | |
dc.relation.lastpage | 162 | |
dc.description.woscategory | Engineering, Electrical & Electronic | |
dc.description.wosresearcharea | Engineering | |
dc.identifier.wosid | WOS:000310380700021 | |
dc.identifier.ctitle | IEEE Symposium on Differential Evolution (SDE) | |
dc.identifier.cdate | APR 11-15, 2011 | |