Lagrangian heuristic for scheduling a steelmaking-continuous casting process
Abstract
One of the biggest bottlenecks in iron and steel production is the steelmaking-continuous casting (SCC) process, which consists of steel-making, re ning and continuous casting. The production scheduling of SCC is a complex hybrid owshop (HFS) scheduling w
Collections
DSpace@YASAR by Yasar University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..