Control of a multi-server make-to-stock production system with setup costs
dc.contributor.author | Özkan, Sinem | |
dc.date.accessioned | 2020-06-03T09:53:41Z | |
dc.date.available | 2020-06-03T09:53:41Z | |
dc.date.issued | 2016 | |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/5536 | |
dc.subject | ındusrtrial engineering | |
dc.title | Control of a multi-server make-to-stock production system with setup costs | |
dc.identifier.tezno | 423950 | |
dc.identifier.demirbas | TEZ-0212 |