Basit öğe kaydını göster

dc.contributor.authorGao, K.Z.
dc.contributor.authorSuganthan, P.N.
dc.contributor.authorPan, Q.K.
dc.contributor.authorTasgetiren, M.F.
dc.date.accessioned2021-01-25T20:49:51Z
dc.date.available2021-01-25T20:49:51Z
dc.date.issued2015
dc.identifier10.1080/00207543.2015.1020174
dc.identifier.issn00207543
dc.identifier.urihttps://www.scopus.com/inward/record.uri?eid=2-s2.0-84938966156&doi=10.1080%2f00207543.2015.1020174&partnerID=40&md5=8b24eda1f04e617d53e45dd26180414c
dc.identifier.urihttps://dspace.yasar.edu.tr/xmlui/handle/20.500.12742/10338
dc.description.abstractThis study addresses flexible job shop scheduling problem (FJSP) with fuzzy processing time. The fuzzy or uncertainty of processing time is one of seven characteristics in remanufacturing. A discrete harmony search (DHS) algorithm is proposed for FJSP wit
dc.language.isoEnglish
dc.publisherInternational Journal of Production Research
dc.titleAn effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time
dc.typeArticle
dc.relation.firstpage5896
dc.relation.lastpage5911
dc.relation.volume53
dc.relation.issue19
dc.description.affiliationsSchool of Electrical and Electronic Engineering, Nanyang Technological University, Singapore, Singapore; School of Computer, Liaocheng University, Liaocheng, China; Department of Industrial Engineering, Yasar University, Izmir, Turkey


Bu öğenin dosyaları:

DosyalarBoyutBiçimGöster

Bu öğe ile ilişkili dosya yok.

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster